We have a material determination condition records in ECC which are transfered to CRM. It seems like the material substitution in CRM has to be a material which exist in the material master. In our scenario we sometimes use alternate materials which are not in the material master. This can be handled in ECC but not in CRM.
Do you know of any BADI / exit in CRM that we can enhance to allow the data to transfer from ECC to CRM?
Thanks!